Know the real cost of your build - before and during construction

Independent documents, signed by an MNIQS Quantity Surveyor, using this month’s actual Lagos market prices. No kickbacks. No guessing.

Cost reports come back signed within 48 hours.

Cost Report

An independent check on what your contractor is charging you — before the money leaves.

  1. SendYou send the bill you were given
  2. VerifyWe confirm the stage the build has reached
  3. PriceThat stage priced at today’s market rates
  4. ReportA signed verdict before you release payment

In the document

  • Verified current stage, confirmed on site
  • Materials and quantities the next phase actually needs
  • What that should cost at today's prices
  • Line-by-line comparison against the bill you were sent
  • Overcharges flagged explicitly
Cost ReportLAN-CR-0047
Billed itemBilledMarket
Cement 50kg, 120 bags1,680,0001,500,000
Sharp sand, 4 × 15T loads500,000420,000
Sandcrete block 9in, 900855,000855,000
Labour, blockwork450,000420,000
Total3,485,0003,195,000

Assessment

Above market by ₦290,000 — cement and sand billed above current rates

Stage verified: blockwork · Aug 2026J. Ajani

Bill of Quantities

A complete, costed list of everything your build needs — every material, every quantity, at current market prices.

  1. SendYou send your drawings
  2. MeasureA Quantity Surveyor measures the whole job
  3. PriceEvery item priced at this month’s market rates
  4. CompareContractors quote against one agreed scope

In the document

  • Measured quantities for the whole build, phase by phase
  • Rates from verified market prices, dated
  • Total cost with a stated contingency
  • Phase breakdown for planning stage payments
  • Plain-English guide to what each phase covers
Bill of QuantitiesLAN-BQ-0112
ItemQtyAmount
Cement, 50kgbag4205,250,000
Sharp sand15T load6630,000
Sandcrete block, 9inblock3,2003,040,000
Steel rod, TMT 12mmtonne3.53,745,000
Roofing sheet, 0.45mm148962,000
Total incl. 8% contingency14,717,160
Rates: Lagos markets · Aug 2026J. Ajani
Why our number is different

We don’t build, we don’t supply materials, we take no commissions

The number we give you is the only thing we're selling. No commissions, no referral fees, no supplier arrangements — nothing that would make an inflated figure pay us better.

What you get from us.

Real Lagos market prices

Cement, sand, rods, blocks, roofing sheets — nearly 300 materials across 15 categories, recorded on the ground with the vendor, market and date attached. Not estimates, not last year's figures.

Quantities, not just prices

Knowing the price of a bag of cement doesn't tell you whether you need 200 of them. We work out what the job actually requires — the part most people can't check themselves.

Signed by a Quantity Surveyor

Every document is reviewed and signed by a Quantity Surveyor holding active MNIQS membership. A professional putting their name to the number.

Written in plain English

Costs broken down by phase, explained so it makes sense whether or not you've built before — and whether or not you can visit the site.

Still deciding

Not sure which one you need?

Tell us where your build has reached and we'll say which document answers your question. If neither does, we'll tell you that too.